B+A Greater Boston

December 2017

Issue link: https://viewer.e-digitaledition.com/i/920813

Contents of this Issue

Navigation

Page 40 of 79

PENTHOUSE SUITE IN BOSTON (UNDER CONSTRUCTION) "Building in the city is logistically 200 percent more dif ficult than in the suburbs. This challenging project was on the top f loor, but the property did not have elevator a ccess . T hi s be cam e a f u l l g ut demolition . We had to develop a roof deck and overcome many other obstacles we don't normally have to deal with, but we pulled together in the usual collaborative way and are pleased with the results of a project that is now 95 percent complete and will be ready by early spring of 2018." The penthouse features a large living room with a wine rack , a kitchen , two bedrooms, a master bath and two and a half bathrooms — as well as views of the city. You can see the Prudential Center through the restored skylight in the kitchen. PHOTOGRAPHER: BETTY MOORE PHOTOGRAPHER: BETTY MOORE PHOTOGRAPHER: BETTY MOORE PHOTOGRAPHER: BETTY MOORE PHOTOGRAPHER: BETTY MOORE PHOTOGRAPHER: BETTY MOORE Before Before After BOSTON.BUILDERARCHITECT.COM Builder+Architect Greater Boston |

Articles in this issue

Links on this page

Archives of this issue

view archives of B+A Greater Boston - December 2017